Skip to content

Help

Where things are in Ravno, and how to write to us when something does not work.

Getting started

Create a project and upload its drawings and documents. Ravno reads the quantities from them and builds a bill of quantities you check row by row. Go to projects

Team and guests

Invite your team from the project's settings, “People and invitations”. Each member sees and does only what their role allows.

A designer, contractor or buyer can get a guest link: they sign in with a code sent to their e-mail, with no account, and see only what you shared with them.

Subscription

Plans, the trial, payments and invoices are on the subscription page. Go to the subscription

What can I upload?

PDF, DWG, DXF, IFC (also zipped), SVG, TIFF, HEIC, photos and spreadsheets. PDF, DWG and DXF drawings open with their layers and line types; the other drawing formats open as sheets. Revit, ArchiCAD, MicroStation, SketchUp and point-cloud files are refused with a hint on how to export them as IFC, DWG, DXF or PDF. A file may be up to 200 MB on Home and 500 MB on Pro and Business.

Your data

Download your data or delete your account from the profile page. An account with no sign-in and no Capture use for 24 months and no active subscription is deleted; a confirmed e-mail address gets a warning a month before. The account is kept while another participant in one of its projects has signed in or used Capture within the last 24 months (details: Privacy policy, section 5). Go to the profile

Privacy · Terms of use

Images and how to check them

Is the BoQ ready?

On “BoQ and offer” the badge at the top right says whether the BoQ is ready; click it for “BoQ readiness”: arithmetic, prices, schedule and coverage, each with its fix beside it. If something blocks, a priced BoQ leaves only with “Send with assumptions”, and those assumptions go with it.

“Assumptions & exclusions” gathers what the offer includes, excludes and assumes: open drawing questions, missing sheets, exclusions of awarded bids. Accepted items are numbered and leave as the offer's annex.

“Alternates” are priced options on the BoQ: select rows in the BoQ and “Create alternate”, change the prices, “Preview in the BoQ”, then accept it as one change or revert it. After a contract, accepting makes a change order.

In the bid comparison a row a bid left out is filled by the “Fill missing rows with” rule (the median of the other bids by default) and becomes an adjustment with “Accept the fill”; “Commercial terms” shows what a shorter payment term costs.

Report a problem

Write to us if something does not work. The link opens an e-mail with the page's address (without the access codes in it), the time and your browser, so we find the problem faster.

Send a report · support@nannertech.com