Hand over the house and claim warranty defects

Once the house is handed over, the builders' guarantees run for years under Наредба 2. Ravno keeps the handover documents, the defects you find, the notices to the contractor and the money held back until they are fixed.

  1. The handover checklist

    In Acceptance, the Commissioning checklist lists the acts and documents the handover needs, which are signed and which are still missing.

    The handover checklist with its signed and missing documents
  2. Download the dossier

    Download the commissioning packet gathers the signed acts, protocols and certificates into one ZIP file, ready for the building authority or a buyer.

  3. Start the warranty

    The warranty periods run from the use permit or certificate. In Warranty periods, Enter document records its number and date; each kind of work then shows until when it is covered.

    The warranty periods counted from the use permit
  4. Log a defect

    New defect records what you found: what and where, its kind and how serious it is, and the day you found it. Photos help the contractor see it before they come.

    A new defect: a leak under the upstairs shower
  5. Notify the contractor

    Tick the defects for one notice, give the contractor's email and press Send the notice. The notice goes as a PDF with a link to answer, and the time to inspect starts that day.

    The notice with its defect and the contractor's email
  6. When the answer is late

    If the contractor has not inspected by the due date, Ravno reminds them and you by email once, with a new link for them to answer.

  7. The contractor answers

    The contractor opens the link with a code sent to their email, no account needed. For each defect they can acknowledge it, propose an inspection date, dispute it or upload a protocol; the defect's status changes as they answer.

    The contractor proposing an inspection date
  8. The retention waits

    Retention shows the money held back from the contractor's payments. Enter the main contract's terms (the share held, the part kept to the warranty's end, when the rest is released) and press Confirm the terms. While a defect is open, the release waits, and the card says why.

    The retention held while the defect is open