Follow the permit procedures

A house goes through several procedures at once: the municipality's building permit, the electricity and water connections, the cadastre and, at the end, commissioning. The documentation controller keeps them in Permits, one track per procedure.

  1. The procedures' tracks

    Each track lists its stages in order, with what each has come to. The stage to act on is marked Next; once it is submitted, it shows the date its answer is due.

    The water utility's track with the connection contract next
  2. Record the answer

    Open the stage. When the answer arrives, set its Status, the outgoing number and Approved on, then save. The next stage becomes the one to act on.

    The connection contract marked approved, with its number and date
  3. Keep the document

    Upload a document attaches the scan or the signed PDF to the stage, so the answer is kept with its procedure. Where a stage has an application form, the button beside it fills it in from the project.

    The stage with the scanned contract attached
  4. The planning indicators

    In Zoning, Planning indicators lists the indicators of the design visa, such as the built-up and gross floor areas, each with its limit where the visa sets one.

    The design's built-up and gross floor areas
  5. Check the setbacks

    Below, each boundary's distance is checked against its ЗУТ rule or the plan's building line: Met, At the limit or Conflict, or To confirm while a failing distance rests on input not yet confirmed. A well, cesspit or pool is checked by its distance to the nearest boundary. Once the house's placement is confirmed, See the shading beside each measured distance opens the 3D model on 21 March at noon with the shadows, and with the neighbours where the set-out plan gives the plot, to show who shades whom. It is a pre-check for the designer, not the authority's decision.

    The setbacks checked against ЗУТ, and a well's distance
  6. Place the house on the plot

    Below the setbacks is The house on its plot: where the house stands and which way it faces. With a set-out plan, the model is fitted to the building's contour, the proposal is drawn on the plot map and how far off it is is said in metres; a poor fit is not offered. Without one, Latitude (°) and Angle to true north (°) are typed in, the angle to true north, not to the grid's. The owner confirms the placement with Confirm the placement. Then the 3D model offers Plot and neighbours, and the project frame in the settings shows the same values.

    The house's placement on its plot, typed in and confirmed by the owner