Certify payment with Protocol 19

Протокол 19 certifies the works done in a period. The contractor drafts it from the reported progress, the client accepts, adjusts or returns each row, and the signed protocol is the ground for payment.

  1. The contractor drafts the claim

    On their own page the contractor picks the period in Payment reports (Протокол 19) and presses New report for a period. The quantities come from the progress reported and accepted by the supervisor; they correct them and leave at zero the rows they do not claim now.

    The new claim with its two claimed rows
  2. A photo or a measurement for the row

    A row over the period's threshold without a photo, a measurement or an Акт 12 is flagged for a check. Measure works the quantity out from dimensions, and the photos button attaches photos from site.

    The excavation row with a photo attached
  3. Submit it for review

    Submit for review sends the claim to the client. In the list it shows as submitted until it is accepted or returned.

    The submitted claim in the contractor's list
  4. Review the claim

    In Protocols 19, open the submitted protocol. Review the claim shows the rows with notes first: a quantity over what was reported, a price other than the contract's, or an amount without evidence.

    The claim's review with the row to check at the top
  5. Accept the rows

    The rows without notes are accepted with one button; each flagged one is accepted, adjusted with a reason or returned. Once all are decided, Ready for signing readies the protocol for signing. If something is wrong, return the whole claim with a note.

    Every row decided, the protocol ready for signing
  6. Record the signing

    The protocol is signed on paper. Record signing records the day it was signed in Signed on and the scanned protocol. The contract's time to pay runs from that day.

    Recording the signing with its date and the scanned protocol
  7. When payment is late

    Once the time to pay has passed, the protocol shows what the late payer owes under art. 309a of the Commerce Act: a fixed compensation for the cost of collecting and statutory interest. Enter Statutory interest, % a year and the payment date.

    The compensation and interest for the late payment
  8. An EU programme's template

    If the house is funded by a programme such as the Recovery Plan (ПВУ), pick its template in Profile. It asks for the Funding source of each row: a grant, national co-financing, own contribution or an ineligible cost.

    The protocol with the ПРР / ПВУ template and a row's funding source